2j
Schedule
2j.1
Clause 2(1)
and
apply the Schedule to the licence including the notes to the
schedule.
Clause
2(1)
The
Licensee may only operate the Radio Equipment:
-
(a) at the
Main Station Address;
-
(b) at an
Alternative Address;
-
(c) at a Temporary
Location;
-
(d) when
Mobile;
-
(e) where this
Licence is a Full Licence only, from a Maritime Mobile location;
and
-
(f) where this
Licence is a Full Licence only, and unless it is a Temporary Licence, the
Licensee may operate in countries which have implemented CEPT Recommendation
T/R 61-01 in accordance with Clause 16(1).
Clause 9(2) and apply Schedule 1 Table C
and the notes to the
schedule.
Clause 9(2)
When operating the Radio Equipment the Licensee
shall:
-
(a) only use
the frequency bands specified in Schedule 1, subject to the limitations set
out in that Schedule;
-
(b) only use
a power level relating to those frequency bands which does not exceed the
maximum power level specified in Schedule 1; and
-
(c) take account
of any other limitations set out in Schedule 1 which apply to the class of
Licence held by the Licensee.
and apply Schedule 1 Table C and the notes
to the schedule.
Click here to find the schedule which it was